  • TOTALENERGIES UPSTREAM NIGERIA LIMITED – Manufacturing of Large Structural Assymetric Clamp Diverless 233Barg for Production Flowlines and Spool at 1250 Waterdepth – 2021
  • TOTALENERGIES UPSTREAM NIGERIA LIMITED – Manufacturing of Straight Structural Assymetric Clamp Diverless 233Barg for Production Flowlines and Spool at 1250 Waterdepth – 2022
  • TOTALENERGIES UPSTREAM NIGERIA LIMITED – Provision of the test pipe and end test caps including welding and NDT for the FAT of the Subsea Pipeline Repair Clamps – 2023
  • Design, Fabrication and Installation of 6 inch ROV deployable structural repair clamp for WT 04 leak repair at 1200m water depth for SNEPCo Bonga FPSO – 2019
  • Nitrogen Purging of 16 inch Bonga Gas Export Pipeline for Installation of Flex Joint Sleeve for SNEPCo – 2019
  • NPDC – Provision of Caterpillar Engines, Generators and MCC Panels Mainteance Services for NPDC Operated Land and Swamp Asset – 2022
  • NPDC – Provision of Perkins Engines, Generators and MCC Panels Mainteance Services for NPDC Operated Land and Swamp Asset – 2022
  • EXXONMOBIL – NCDMB NOGAPS Oil and Gas Industrial Park – Power System and Underground CablingProject: Electrical Power System Installation, Power Plant Building Construction, Internet Protocol (IP) Security and Local Area Network (LAN) System – Unified Communication System – 2022 
  • Integrity Checks, Valves & Barrel Doors Maintenance on Production Flowlines/GEP on Bonga FPSO – 2019
  • Leeden Actuator Installation Support on Bonga FPSO – 2020
  • Bonga Riser Interface Clamp Replacement Project – Design, Fabrication and Installation of Riser Clamps on Bonga FPSO – 2020
  • Hot Bolting Services on Bonga FPSO – 2019
  • Rental of Subsea Pipeline Repair Equipment (Pipeline Handling Frames, ROV Control Skids, Pipeline Coating Removal Tool) for Technip USA – 2019 in collaboration with Connector Subsea Solutions Norway.
  • Fabrication of Restraint Clamps for Fugro Australia – 2019 in collaboration with Connector Subsea Solutions, Norway
  • Rental of Subsea Pipeline Repair Equipment (Pipeline Handling Frames, ROV Control Skids, Pipeline Coating Removal Tool, Pipe end preparation tool, Pipe Cutting tool Mirage Remote Diamond wire saw) for Oceaneering International Dubai – 2019 in collaboration with Connector Subsea Solutions, Norway
  • Specialized Pipeline Maintenance for SNEPCo – Ongoing
  • Remote Repair of Leaking Actuator Fittings and Gas Flow-meter Fittings on XT at 1340m water depth on Akpo Field for Total – Negotiations ongoing
  • Deepwater Hydraulic Tubing Repairs – Ongoing
  • Provision of Civil Engineering Services for OML 143 Block —  Tuesday, 29th March 2022
  • Provision of Civil Engineering Services for OPL2005 Block —  Tuesday, 29th March 2022
  • Provision of Civil Engineering Services forOML2006 Block —  Tuesday, 29th March 2022
  • SNEPCo – Water Injection Flowline WT-04 Leak Repair Project – 2019
  • SNEPCo – Water Injection Flowline WT-04 Leak Repair Project (Cutting Mac Eng&Supply) – 2020
  • SNEPCo – Water Injection Flowline WT-04 Leak Repair Project (Offshore Installation) – 2019
  • SNEPCo – Nitrogen Purging Procedure for 16″ GEP (Engineering Assessment) – 2019
  • SNEPCo – Integrity Check Valve & Barrel Doors Maintenance Service – 2019
  • SNEPCo – Hot Bolting Services – 2019
  • SNEPCo – Bonga Riser Spool Clamp Project (Phase 1 & 2) – Onshore Fabrication – 2022
  • SNEPCo  – Rental of 100mm and 110mm Low clearrance Torque header – 2022
  • SNEPCo – Rental of 2 Nos 100mm Low clearrance Torque header – 2022
  • SNEPCo – Fabric Maintenance – Paint on Port Process Module – 2022
  • SNEPCo – Services for support personnel for source pump A/C repair – 2022
  • SNEPCo – Enclosure repairs for SPM Booster pumps, Turbines and Cooler Fans enclosures – Phase 1 – 2022
  • SNEPCo – Lutz Elevator Repair and Maintenance on BONGA FPSO – 2022
  • SNEPCo – Lutz Elevator Repair and Maintenance on BONGA FPSO – 2022
  • SNEPCo – Motor Repair Works – 2022
  • SNEPCo – Anode Replacement / Change Out on Bonga – 2022
  • SNEPCo – Inspection of BOORS & Water Injection Flowline on Bonga – 2022
  • SNEPCo – BOOR Biffi Valve Acutator Refurbishment and Installation – 2022
  • SNEPCo – Ex Inspections for 1 Month – 2022
  • SNEPCo – Ex Inspections for 5 Months – 2022
  • SNEPCo – Provision of Manpower for Mooring Chain Lines Replacement Project; Open Water Installation Engr – 2022
  • SNEPCo – Provision of Onsite Technical Trainings for SNEPCO Bonga Personnel – Machinery Vibration Analysis certification training and exam. – 2022
  • SNEPCo – Bonga Lighting Maintenance works – 2022
  • SNEPCo – Replacement Instrument Air Dryer – 2022
  • SNEPCo – Water Flood LTS – MINOX Bypass (Batch 6)  – 2022
  • SNEPCo – Supply of Personnel for WaterFlood LTS – 2022
  • SNEPCo – Request for Manpower to Perform E&I Site Construction Activites on Water Flood – 2022
  • SNEPCo – WaterFlood Batch 1-5 Grayloc spools Installation – 2022
  • SNEPCo – Provision of personnel and consumable for waterflood Minox Bypass Project – 2022
  • SNEPCo – Bonga Structural Walkway Porches – 2022
  • SNEPCo – Bonga Accommodation Detailed Design – 2022
  • SNEPCo – Onshore Warehousing Space Services – 2022
  • SNEPCo – Provision of 10 Permit Holders (White Hat) – 2022
  • SNEPCo – Provision of Lifting and Hoisting Person – 2022
  • SNEPCo – Procurement Of Pipes, Pipe Fittings, Structural Materials & Fasteners for Bonga WFLTS BELCORP – 2022
  • SNEPCo – Provision of Manpower & Equipment for Non-Waterflood Piping Replacement  Project (Batch 2) CDR Bonga Offshore – 2022
  • SNEPCo – Provision of Pressurised Welding Habitat on Bonga – 2022
  • SNEPCo – Flotel Gangway Landing Platform Tie-Down Padeyes- 2022
  • SNEPCo – Steam Seperator‐SPM Piping Fabrication and Loadout
  • SNEPCo – CDR NWPR B2 Fabrication Packaging & Loadout (Methanol Line)
  • SNEPCo – CDR Export‐Line Fabrication & Installation
  • Slot Doubler Related Topsides Upgrade
  • SNEPCo – SONAR ITEMS; Fabrication, QAQC and Loadout – 2022
  • SNEPCo – Replacement of Crude Rundown Meter Fabrication & Offshore Installation – 2022
  • SNEPCo – Check Valves Replacement witj PUP Piece Upstream NRNs – 2022
  • SNEPCo – WHRU Heat Exchanger Bundle Frame Fabrication and Loadout – 2022
  • SNEPCo – Provision of Rope Access Painters and Supervisor (Bonga Opex) – 2022
  • SNEPCo – UTEC iSite MCDR Development; Digital Twin Services – 2022
  • SNEPCo – STP – SME site visit for health check (DO conformance; Provision of Engineer for STP Functionality Investigation and Modification) – 2022
  • SNEPCo – Services for Bonga Top Mooring Chains Anodes Installation; One Specialist Engineer – 2022
  • SNEPCo – Bonga Lighting Maintenance works – 2022
  • SNEPCo – Feasibility Studies WI Flowline Inspection – 2022
  • SNEPCo – Ultrasonic Inspection of 12″ WI FL Swivel Welds – 2022
  • SNEPCo – Water Injection Flowline Inspection (6” focused) – 2022
  • SNEPCo – Provision of HVAC Upgrade Services on Bonga – 2022